Shift Schedule Guidance Format: A PDF description of the format may be obtained at: http://www.epa.gov/otaq/cmug.htm This guidance document is a PDF file with the link http://www.epa.gov/otaq/cert/cfeis/d7-shift.pdf Graphics: Graphics of the driver's trace image for the FTP, HWFET and other drive schedules are at http://www.epa.gov/otaq/labmthod.htm Text Files for Traces: One Hertz dynamometer driving schedule trace files are at http://www.epa.gov/otaq/labmthod.htm Standard EPA 6 speed FTP and HWFET shift schedules: copies of these files may be found at http://www.epa.gov/otaq/labmthod.htm through the links http://www.epa.gov/oms/emisslab/methods/ftpshift.txt and http://www.epa.gov/oms/emisslab/methods/hwyevnts.jpg Other helpful files: FTP10HzTable.xls contains a 10 Hertz speed table for the FTP. UDDS followed by the first 505 seconds of the UDDS HWY10HzTable.xls contains a 10 Hertz speed table for the HWFET. HWFET followed by 15 idle seconds followed by the HWFET. When you submit shift schedules: - times for shift points must match 1 Hertz CFR driving schedules linearly interpolated to 10 Hertz. example: the speed at t=25.3 seconds (15.08 mph) is derived by linear interpolation between speed point t=25.0 seconds (14.3 mph) and speed point t=26.0 seconds (16.9 mph) - time/speed shift points must match the 10 Hz drive schedule +/- 1 second. example: a FTP shift point at t=1394.3 seconds (15.08 mph) must be no lower than t=1394.2 seconds (14.82 mph) must be no higher than t=1394.4 (15.34 mph) Special Guidance for the EPA75 Federal Test Procedure: An helpful graphic images of the FTP(Cert) is available at http://www.epa.gov/otaq/labmthod.htm through the link http://www.epa.gov/oms/emisslab/methods/ftpevnts.jpg -Refer to the timeline graphic at http://www.epa.gov/oms/emisslab/methods/ftpevnts.jpg -Submit shift points in one file for all three FTP phases according to http://www.epa.gov/otaq/cert/cfeis/d7-shift.pdf -The FTP dynamometer driving schedules is composed of the first 1369 seconds of the 1372 second UDDS followed by the first 505 seconds of the 1372 UDDS -Driving Times (driver's trace scrolling time): The cold start phase begins at t=0 seconds and ends at t=505 seconds The transient phase begins at t=505 seconds and ends at t=1369 seconds The hot start phase begins at t=1369 seconds and ends at t=1874 seconds -The following schedule of comments is displayed on the driver's trace. Do not submit shift points or comments at these times. t= 0.0 (bag set #1 being filled) t= 15.0 (put trans in gear) t= 505.0 (bag set #2 being filled) t=1369.0 (hot soak begins, then bag 3) t=1384.0 (put trans in gear) t=1384.0 (end of driving schedule) -Shift schedules for the FTP are also utilized for the UDDS (LA4) and 505 drive schedules. Special Instructions for the HWFET: -Submit shift points in one file for both prep-HWFET and sampled HWFET according to http://www.epa.gov/otaq/cert/cfeis/d7-shift.pdf - The HWFET dynamometer drivingschedule is composed of a non-sampled vehicle warmup 765 seconds HWFET drive schedule followed by 15 idle seconds followed by a sampled 765 seconds HWFET drive schedule -Driving Times (driver's trace scrolling time): The warmup (no sample taken) phase begins at t=0 seconds and ends at t=765 seconds The sampled phase begins at t=780 seconds and ends at t=1545 seconds -The following schedule of comments is displayed on the driver's trace. Do not submit shift points or comments at these times. t= -8.0 (Eng on, in gear, before 0 secs) t= 780.0 (bag set #1 being filled) t=1545.0 (end of driving schedule) -Shift schedules for the FTP are also utilized for the UDDS (LA4) and 505 drive schedules. Special Instructions for the SC03 and US06 dynamometer drive schedules -Submit shift points in one file for the 594 second SC03 and US06 http://www.epa.gov/otaq/cert/cfeis/d7-shift.pdf - The SC03 and US06 dynamometer drivingschedules at EPA are composed of a non-sampled vehicle warmup using the first 594 seconds of the SC03 or US06 600 second drive schedule followed by 96 idle seconds followed by a sampled using the first 594 seconds of the SC03 or US06 600 second drive schedule -Driving Times (driver's trace scrolling time): The warmup (no sample taken) phase begins at t=0 seconds and ends at t=594 seconds The pre-sample idle period begins at t=594 seconds and ends at t=1200 seconds The sampled phase begins at t=1200 seconds and ends at t=1794 seconds -The following schedule of comments is displayed on the driver's trace. Do not submit shift points or comments at these times. t= -8.0 (Eng on, in gear, before 0 secs) t= 690.0 (bag set #1 being filled) t=1286.0 (end of driving schedule)