SO2 Data Requirements Rule January 13, 2017 State Submittals - Georgia
You may need a PDF reader to view some of the files on this page. See EPA’s About PDF page to learn more.- Georgia Department of Natural Resources (GADNR) Letter Confirming Receipt of Permit Revocation Request - Branch Electric Generating Plant (PDF)(2 pp, 538 K, 12/10/2015)
- GADNR Letter Confirming Receipt of Permit Revocation Request - Plant Kraft (PDF)(3 pp, 87 K, 11/09/2016)
- GADNR Plant Branch and Plant Kraft Permit Revocation Cover Letter (PDF)(1 pg, 313 K, 12/29/2016)
- GADNR Plant Bowen Submission Cover Letter (PDF)(1 pg, 241 K, 12/28/2016)
- Georgia Power – Plant Bowen SO2 DRR Modeling Report (PDF)(4 pp, 1 MB, 11/18/2016)
- Plant Bowen Dispersion Modeling – Georgia EPD Review (PDF)(8 pp, 761 K, 12/28/2016)
- GADNR Plant Wansley Submission Cover Letter (PDF)(1 pg, 242 K, 12/28/2016)
- Georgia Power – Plant Wansley SO2 DRR Modeling Report (PDF)(6 pp, 2 MB, 11/18/2016)
- Plant Wansley Dispersion Modeling - Georgia EPD Review (PDF)(8 pp, 874 K, 12/28/2016)
- GADNR Georgia-Pacific Savanna River Mill and Georgia Power Plant McIntosh Cover Letter (PDF)(1 pg, 242 K, 12/13/2016)
- Georgia-Pacific Savannah River Mill SO2 DRR Modeling Report (PDF)(77 pp, 15 MB, 11/09/2016)
- Georgia-Pacific Savannah River Mill and Georgia Power Plant McIntosh Dispersion Modeling – Georgia EPD Review (PDF)(14 pp, 1 MB, 12/13/2016)
- GADNR Plant Yates Submission Cover Letter (PDF)(1 pg, 314 K, 01/12/2017)
- Yates Steam-Electric Generating Plant Operating Permit Renewal Application Review (PDF)(19 pp, 440 K, 01/27/2017)
- Yates Steam -Electric Generating Plant Operating Permit (PDF)(57 pp, 3 MB, 01/10/2017)