SO2 Data Requirements Rule January 13, 2017 State Submittals - Oklahoma
You may need a PDF reader to view some of the files on this page. See EPA’s About PDF page to learn more.- Letter from OK Department of Environmental Quality – Cover Letter for SO2 DRR Modeling Reports and Notification of (PDF)(3 pp, 433 K)
- AES Shady Point SO2 DRR Modeling Report (PDF)(33 pp, 2 MB)
- AES Shady Point List of Modeling Files (PDF)(4 pp, 155 K)
- Northeastern Power Station SO2 DRR Modeling Report - Actuals (PDF)(33 pp, 2 MB)
- Northeastern Power Station SO2 DRR Modeling Report - PTE (PDF)(32 pp, 2 MB)
- Northeastern List of Modeling Files (PDF)(4 pp, 97 K, 01/26/2017)
- Northeastern Power Station Permit Memorandum (PDF)(53 pp, 3 MB, 08/17/2016)
- Ponca City Plant SO2 DRR Modeling Report (PDF)(34 pp, 2 MB, 10/21/2016)
- Ponca City Plant List of Modeling Files (PDF)(4 pp, 156 K, 01/26/2017)
- Holcim Ada Portland Cement Plant Permit Memorandum (PDF)(89 pp, 1 MB, 12/08/2016)
- Letter from Holcim - Notification that Two Wet Kilns Have Shut Down Permanently (PDF)(1 pg, 192 K, 01/03/2017)