An official website of the United States government.

This is not the current EPA website. To navigate to the current EPA website, please go to www.epa.gov. This website is historical material reflecting the EPA website as it existed on January 19, 2021. This website is no longer updated and links to external websites and some internal pages may not work. More information »

Notice of Final Approval for an Alternative Work Practice Standard for Asbestos Cement Pipe Replacement

On May 30, 2019, EPA approved an alternative work practice, called close tolerance pipe slurrification (CTPS), that can be used to comply with the Asbestos NESHAP. As the infrastructure of municipalities age, utilities need to replace deteriorated water pipes made of asbestos cement, which can be problematic and costly because pipes run beneath and beside major roadways, buildings and overlap other utilities (e.g., gas, electricity). This work practice provides utilities with a method of removing and replacing asbestos cement pipes that is as protective of human health and the environment as the Asbestos NESHAP.

See the pre-publication Federal Register notice and a summary fact sheet below.

You may need a PDF reader to view some of the files on this page. See EPA’s About PDF page to learn more.