An official website of the United States government.

This is not the current EPA website. To navigate to the current EPA website, please go to www.epa.gov. This website is historical material reflecting the EPA website as it existed on January 19, 2021. This website is no longer updated and links to external websites and some internal pages may not work. More information »

Water Infrastructure Finance and Innovation Act (WIFIA)

Birmingham Infrastructure Repair and Rehabilitation Project

 
Borrower: Birmingham Water Works
Location: Bimingham, Alabama
Invited WIFIA Loan Amount: $147 million
Population Served by Project: 400,000

Project Type: Drinking Water

Project Description

The Infrastructure Repair and Rehabilitation Project will include three projects: 1) Lake Purdy dam rehabilitation; 2) water main replacement; and 3) distribution storage tank rehabilitation. The purpose of these projects is improving water resiliency, quality, and supply dependability, particularly during a drought.

You may need a PDF reader to view some of the files on this page. See EPA’s About PDF page to learn more.

Water Infrastructure Finance and Innovation Act (WIFIA)