Population Served by Project: 480,000
Project Type: Drinking Water
Project Description
The 36 inch / 42 inch Raw Water Intake Replacement Project will include the design and construction of the replacement intake and the abandonment of the existing intake that is currently failing. The purpose of this project is to replace aging infrastructure that is underperforming in order to maintain capacity and regulatory compliance of the water treatment facility.
You may need a PDF reader to view some of the files on this page. See EPA’s About PDF page to learn more.- Evanston (PDF)(1 pg, 264 K)