This is not the current EPA website. To navigate to the current EPA website, please go to www.epa.gov. This website is historical material reflecting the EPA website as it existed on January 19, 2021. This website is no longer updated and links to external websites and some internal pages may not work. More information »

Water Infrastructure Finance and Innovation Act (WIFIA)

King County Georgetown Wet Weather Treatment Station

Georgetown Wet Weather Treatment Station
 
Borrower: King County
Location: King County, Washington
WIFIA Loan Amount: $134.5 million
Total WIFIA Project Costs: $275 million
Population Served by Project: 175,000 people
Number of Jobs Created: 1,400 jobs
 

Project Description

King County will construct a new Wet Weather Treatment Station using high-rate clarification, conveyance pipelines, and outfall structure to treat and convey combined sewer overflows prior to being discharged into the Lower Duwamish Waterway. When constructed, the station can treat up to 70 million gallons of combined rain and wastewater a day that would otherwise have discharged directly to the Duwamish without treatment during storm events. This project is designed to control two existing combined sewer overflows to meet the Washington State control standard. 

Project Benefits

  • Designed to reduce over 95 percent of untreated wastewater and stormwater entering the Duwamish River by controlling two existing combined sewer overflows.
  • Redevelops a Brownfields site.
  • Saves King County up to $32 million from financing with a WIFIA loan compared to a bond issuance.
  • Creates 1,400 jobs and job-training opportunities during design, construction, and operation.