This is not the current EPA website. To navigate to the current EPA website, please go to www.epa.gov. This website is historical material reflecting the EPA website as it existed on January 19, 2021. This website is no longer updated and links to external websites and some internal pages may not work. More information »

Freedom of Information Act (FOIA)

2011 proposed Groundwater Interim Measures Work Plan Addendum for Walter Coke facility

This Addendum to the previous Interim Measure Work Plan (IMWP), submitted to EPA on February 20, 2002, presents minor modifications to the well locations proposed in the original IMWP, and proposes performance monitoring not included in the original IMWP. In addition, EPA's comments to the original IMWP, submitted on November 24, 2003, are addressed in this Addendum.

You may need a PDF reader to view some of the files on this page. See EPA’s About PDF page to learn more.