Records of Decision related to the cleanup progress of the Northeast Church Rock Mine (NECR).
If you experience a problem reading a document with assistive technology, please contact us.
You may need a PDF reader to view some of the files on this page. See EPA’s About PDF page to learn more.
-
NECR Action Memorandum Amendment to Increase the Cost Ceiling for the NECR Non-Time Critical Removal Action (PDF)(9 pp, 262 K,
04/21/2017)
The removal action described in this memorandum calls for a cost ceiling increase to the Non-Time Critical Removal Action at NECR of the excavation of approximately one million cubic yards of waste material.
-
NECR Action Memorandum for Non-Time-Critical Removal Action (PDF)(96 pp, 2 MB,
09/29/2011)
The removal action described in this memorandum calls for the excavation of approximately one million cubic yards of waste material from the Northeast Church Rock Mine Site and placement of this waste at a location or a facility that EPA has determined to be acceptable for the receipt of CERCLA waste under applicable laws.