This is not the current EPA website. To navigate to the current EPA website, please go to www.epa.gov. This website is historical material reflecting the EPA website as it existed on January 19, 2021. This website is no longer updated and links to external websites and some internal pages may not work. More information »

National Pollutant Discharge Elimination System (NPDES)

Integrated Planning - State Integrated Plans



The table below is a preliminary list of municipalities that indicated they are developing or have published a full or partial integrated plan.

The following links exit the site Exit

Integrated Planning Inventory as of November 2020
Municipality State EPA Region  Date Plan Completed Name of Plan Implementation Mechanism1
Akron Ohio 5 2015 Integrated Plan Consent Decree
Atlanta Georgia 4 2017 Water Resource Management Plan NPDES Permit | NPDES Permit
Boone Iowa 7 2016 City of Boone Integrated Wastewater Plan NPDES Permit
Burlington Iowa 7 2019 Burlington Wastewater and Stormwater Integrated Management Plan None
Columbia Missouri 7 2018 Columbia Wastewater and Stormwater Integrated
Management Plan
NPDES Permit
Columbus Ohio 5 2015 Integrated Plan and 2015 Wet Weather Management Plan NPDES Permit and Consent Order
Exeter / Stratham / Newfields New Hampshire 1 2015 Water Integration for Squamscott Exeter (WISE) Preliminary Integrated Plan None
Fall River Massachusetts 1 2016 Integrated Wastewater and Stormwater Master Plan None
Hamilton County (Cincinnati) Ohio 5 2010 Project Groundwork None
Hampton Roads Sanitation District Virginia 3 2017 Integrated Plan / Regional Wet Weather Management Plan None
Harrisburg Pennsylvania 3 2018 City Beautiful H2O Program Plan None
Hartford Connecticut 1 2018 2018 Integrated Plan and Long Term Control Plan None
Johnson County Kansas 7 2019 Johnson County Wastewater Integrated Management Plan Consent Order
Lakewood Ohio 5 2016 Integrated Wet Weather Improvement Plan None
Lansing Michigan 5 2011 The City of Lansing 2012 Wet Weather Control Plan None
Lawrence Kansas 7 2012 2012 Integrated Wastewater Utilities Plan Permit
Lima Ohio 5 2014 Lima, Ohio Integrated Plan-based Consent Decree Consent Decree
Los Angeles California 9 2012 Water Integrated Resources Plan 5 Year Review None
New Bedford Massachusetts 1 2017 Long Term CSO and Integrated Capital Improvements Plan Consent Order
Richmond Virginia 3 2017 2017 RVA Clean Water Plan NPDES Permit
San Diego California 9 2013 2013 Integrated Regional Water Management Plan None
Santa Maria California 9 2016 Integrated Plan for Water Quality None
Seattle Washington 10 2015 Plan to Protect Seattle's Waterways NPDES Permit and Consent Degree
Springfield Massachusetts 1 2014 Springfield Water and Sewer Commission Integrated Wastewater Plan Administrative Order
Springfield Missouri 7 2015 Integrated Plan for the Environment NPDES Permit
Spokane Washington 10 2014 Integrated Clean Water Plan None
1 Implemented per Water Infrastructure Improvement Act (WIIA) means “through a permit, order, or judicial consent decree.” NPDES = National Pollutant Discharge Elimination System