SO2 Data Requirements Rule January 13, 2017 State Submittals - Mississippi
You may need a PDF reader to view some of the files on this page. See EPA’s About PDF page to learn more.- Permit Application Summary Plant Jack Watson (PDF)(2 pp, 91 K, 01/13/2017)
- Information Relative to Draft Operating Permit Watson Electrical Generating Facility (PDF)(8 pp, 385 K, 01/13/2017)
- Title V Permit Watson Electrical Generating Facility (PDF)(61 pp, 2 MB, 12/29/2016)
- Title V Permit Watson Electrical Generating Facility (PDF)(22 pp, 705 K, 01/10/2017)
- Delisle Plant Emissions Inventory (PDF)(4 pp, 136 K, 01/10/2017)
- Mississippi Department of Environmental Quality (MDEQ) Termination of Operating Permit Pursue Thomasville Plant (PDF)(2 pp, 65 K, 12/09/2017)
- MDEQ Cover Letter SO2 DRR Modeling Report (PDF)(3 pp, 96 K, 01/12/2017)
- MDEQ Updated Area Designation Recommendations (PDF)(2 pp, 67 K, 01/10/2017)
- Daniel Steam Electric Generating Plant SO2 DRR Modeling Report (PDF)(24 pp, 2 MB, 01/12/2017)
- Red Hills Generating Facility SO2 DRR Modeling Report (PDF)(19 pp, 2 MB, 12/13/2016)