Superfund: Post Construction Guidance and Documents
Post construction completion (PCC) is the name commonly given to activities at Superfund remedial actions following remedy construction, including operation and maintenance (O&M) and Long-Term Response Action (LTRA). The documents found on this page include guidance and policy documents as well as general fact sheets and information related to general PCC, O&M and LTRA. The Guidance for Management of Superfund Remedies in Post Construction provides comprehensive guidance for managing superfund remedial actions during post construction. For more information on post construction topics, including additional guidance and documents, please visit the main Post Construction Completion page.
On this page:
Guidance and Informational Documents
Year | Title | Topic | Document Number |
---|---|---|---|
2017 | GUIDANCE FOR MANAGEMENT OF SUPERFUND REMEDIES IN POST CONSTRUCTION - February 2017 (PDF)(61 pp, 1.4 MB) | Post Construction Completion | OLEM 9200.3-105 |
2012 | FINAL IMPLEMENTATION OF THE NATIONAL STRATEGY TO MANAGE POST CONSTRUCTION COMPLETION ACTIVITIES AT SUPERFUND SITES FACT SHEET - February 2012 (PDF)(9 pp, 473 K) | Post Construction Completion | OSWER 9355.0-105A |
2009 | OPERATIONAL AND FUNCTIONAL DETERMINATION AND THE TRANSFER OF FUND-LEAD VAPOR INTRUSION MITIGATION SYSTEMS TO THE STATE - April 2009 (PDF)(4 pp, 973 K) | Operation and Maintenance | OSWER 9200.2-72 |
2008 | RECOMMENDED ANNUAL O&M/REMEDY EVALUATION CHECKLIST - April 2008 (.DOCX)(27 pp, 793 K) | Operation and Maintenance | OSWER 9355.0-87 |
2008 | RECOMMENDED ANNUAL O&M/REMEDY EVALUATION CHECKLIST FOR CONTAMINATED SEDIMENT REMEDIES - September 2008 (.DOCX)(10 pp, 358 K) | Operation and Maintenance | OSWER 9355.0-118 |
Year | Title | Topic | Document Number |
Superseded Guidance and Informational Documents
These documents include guidance and policy documents as well as general fact sheets and information related to PCC, O&M and LTRA that have been superseded by the Guidance for Management of Superfund Remedies in Post Construction. Please note that these superseded documents are included here as a reference.
Title | Topic | Document Number |
---|---|---|
SUPERSEDED: FACT SHEET - SUPERFUND POST CONSTRUCTION COMPLETION: AN OVERVIEW - June 2001 (PDF)(15 pp,108 K) | Post Construction Completion | EPA-540-F-01-009, OSWER 9355.0-79FS |
SUPERSEDED: FACT SHEET- TRANSFER OF LONG-TERM RESPONSE ACTION (LTRA) PROJECTS TO STATES - July 2003 (PDF)(10 pp, 598 K) | Long Term Response Action | OSWER 9355.0-81FS-A, EPA 540-F-01-021 |
SUPERSEDED: MEMO REGARDING POLICY ON RECALCULATING THE LONG-TERM RESPONSE ACTION (LTRA) TEN-YEAR TIME PERIOD - June 2006 (PDF)(4 pp, 115 K) | Long Term Response Action | OSWER NO. 9355.0-109 |
SUPERSEDED: OPERATION AND MAINTENANCE IN THE SUPERFUND PROGRAM- May 2001 (PDF)(11 pp, 189 K) | Operation and Maintenance | OSWER 9200.1-37FS, EPA 540-F-01-004 |
SUPERSEDED: PAYING FOR REMEDY REPAIRS OR MODIFICATIONS DURING THE STATE-FUNDED PERIOD OF OPERATION AND MAINTENANCE (O&M) - April 2007 (PDF)(4 pp, 1.1 MB) | Operation and Maintenance | OSWER 9375.2-12 |
Title | Topic |