An official website of the United States government.

This is not the current EPA website. To navigate to the current EPA website, please go to www.epa.gov. This website is historical material reflecting the EPA website as it existed on January 19, 2021. This website is no longer updated and links to external websites and some internal pages may not work. More information »

Menu

Superfund

Superfund: Post Construction Guidance and Documents

Post construction completion (PCC) is the name commonly given to activities at Superfund remedial actions following remedy construction, including operation and maintenance (O&M) and Long-Term Response Action (LTRA). The documents found on this page include guidance and policy documents as well as general fact sheets and information related to general PCCO&M and LTRA. The Guidance for Management of Superfund Remedies in Post Construction provides comprehensive guidance for managing superfund remedial actions during post construction. For more information on post construction topics, including additional guidance and documents, please visit the main Post Construction Completion page.

On this page:


Guidance and Informational Documents

YearTitleTopicDocument Number
PCC Guidance and Informational Documents
2017 GUIDANCE FOR MANAGEMENT OF SUPERFUND REMEDIES IN POST CONSTRUCTION - February 2017 (PDF)(61 pp, 1.4 MB) Post Construction Completion OLEM 9200.3-105
2012 FINAL IMPLEMENTATION OF THE NATIONAL STRATEGY TO MANAGE POST CONSTRUCTION COMPLETION ACTIVITIES AT SUPERFUND SITES FACT SHEET - February 2012 (PDF)(9 pp, 473 K) Post Construction Completion OSWER 9355.0-105A
2009 OPERATIONAL AND FUNCTIONAL DETERMINATION AND THE TRANSFER OF FUND-LEAD VAPOR INTRUSION MITIGATION SYSTEMS TO THE STATE - April 2009 (PDF)(4 pp, 973 K) Operation and Maintenance OSWER 9200.2-72
2008 RECOMMENDED ANNUAL O&M/REMEDY EVALUATION CHECKLIST - April 2008 (.DOCX)(27 pp, 793 K) Operation and Maintenance OSWER 9355.0-87
2008 RECOMMENDED ANNUAL O&M/REMEDY EVALUATION CHECKLIST FOR CONTAMINATED SEDIMENT REMEDIES - September 2008 (.DOCX)(10 pp, 358 K) Operation and Maintenance OSWER 9355.0-118
YearTitleTopicDocument Number
Showing 1 to 5 of 8 entries

Top of Page


Superseded Guidance and Informational Documents

These documents include guidance and policy documents as well as general fact sheets and information related to PCC, O&M and LTRA that have been superseded by the Guidance for Management of Superfund Remedies in Post Construction. Please note that these superseded documents are included here as a reference.

Superseded PCC Guidance and Informational Documents
TitleTopicDocument Number
SUPERSEDED: FACT SHEET - SUPERFUND POST CONSTRUCTION COMPLETION: AN OVERVIEW - June 2001 (PDF)(15 pp,108 K) Post Construction Completion EPA-540-F-01-009, OSWER 9355.0-79FS
SUPERSEDED: FACT SHEET- TRANSFER OF LONG-TERM RESPONSE ACTION (LTRA) PROJECTS TO STATES - July 2003 (PDF)(10 pp, 598 K) Long Term Response Action OSWER 9355.0-81FS-A, EPA 540-F-01-021
SUPERSEDED: MEMO REGARDING POLICY ON RECALCULATING THE LONG-TERM RESPONSE ACTION (LTRA) TEN-YEAR TIME PERIOD - June 2006 (PDF)(4 pp, 115 K) Long Term Response Action OSWER NO. 9355.0-109
SUPERSEDED: OPERATION AND MAINTENANCE IN THE SUPERFUND PROGRAM- May 2001  (PDF)(11 pp, 189 K) Operation and Maintenance OSWER 9200.1-37FS, EPA 540-F-01-004
SUPERSEDED: PAYING FOR REMEDY REPAIRS OR MODIFICATIONS DURING THE STATE-FUNDED PERIOD OF OPERATION AND MAINTENANCE (O&M) - April 2007 (PDF)(4 pp, 1.1 MB) Operation and Maintenance OSWER 9375.2-12
TitleTopic 
Showing 1 to 5 of 7 entries

Top of Page