An official website of the United States government.

This is not the current EPA website. To navigate to the current EPA website, please go to www.epa.gov. This website is historical material reflecting the EPA website as it existed on January 19, 2021. This website is no longer updated and links to external websites and some internal pages may not work. More information »

Underground Injection Control (UIC)

EPA Dewey-Burdock Class III and Class V Injection Well Final Area Permits

For more documents related to this action, please visit Docket ID EPA-R08-OW-2019-0512.

Appeals of the aquifer exemption associated with the Dewey Burdock Class III Area Permit must be filed in accordance with 42 USC § 300j-7, not 40 CFR § 124.19, because it is a final agency action independent from the permit. See In re Florence Copper, 17 EAD 406, 419 (EAB 2017). Pursuant to 40 CFR § 23.7, the 45-day period discussed in 42 USD § 300j-7(a)(2) begins two weeks after the date of signature of the aquifer exemption. Therefore, appeals of this aquifer exemption have to be filed by January 22, 2021.

Due to office closures related to the COVID-19 outbreak, at this time please do not contact EPA via regular mail.

Contact Info:
Valois Robinson robinson.valois@epa.gov 
 
 

Applicant or Respondent

Azarga Uranium Corporation/Powertech USA Inc.P.O. Box 448, Edgemont, SD 57735

 

Information Available for Review:

 All information submitted by the applicant and generated by the EPA during permit application review is available for public review as part of the administrative record.
Click on the links below to review the  EPA Dewey-Burdock Class III and Class V Injection Well Final Area Permits and related documents.
You may need a PDF reader to view some of the files on this page. See EPA’s About PDF page to learn more.