View Chapter 5 of the documentation for EPA Power Sector Modeling Platform v.5.13, including associated attachments.
- Table 5-22: Cost of Building Pipelines to Coal Plants (XLSX)(1 pg, 93 K)
- Table 5-23: Coal Steam Units with Natural Gas Co-firing Option (XLSX)(1 pg, 30 K)
- Chapter 5: Emission Control Technologies (PDF)(42 pp, 940 K, November, 2013)
- Attachment 5-1: Wet FGD Cost Methodology (PDF)(10 pp, 425 K, March, 2013)
- Attachment 5-2: SDA FGD Cost Methodology (PDF)(9 pp, 399 K, March, 2013)
- Attachment 5-3: SCR Cost Methodology (PDF)(9 pp, 413 K, March, 2013)
- Attachment 5-4: SNCR Cost Methodology (PDF)(11 pp, 661 K, March, 2013)
- Attachment 5-5: DSI Cost Methodology (PDF)(10 pp, 438 K, March, 2013)
- Attachment 5-6: Hg Cost Methodology (PDF)(23 pp, 518 K, March, 2013)
- Attachment 5-7: PM Cost Methodology (PDF)(9 pp, 262 K, March, 2013)