Posted below are EPA's responses (in chronological order) to submitted Part 75 petitions in 2018. Note that the actual, signed and dated response sent to the designated representative constitutes EPA’s official response and governs. When a response is posted below, EPA is not aware of any differences between the posted response and the actual, signed and dated response. EPA intends, and believes, that such differences -- if any -- will be minor and non substantive. For more information, or to see petition responses from other years, return to Part 75 Petition Responses.
You may need a PDF reader to view some of the files on this page. See EPA’s About PDF page to learn more.-
Merrimack Station (PDF)(4 pp, 54 K,
February 8, 2018)
Approval for the use of an alternative stratification test procedure for Units 1 and 2.
-
Greenidge Electrice Generating Station (PDF)(4 pp, 65 K,
May 30, 2018)
Approval for the use of an alternative monitoring procedure during the period prior to the probationary calibration error test of a replacement stack flow monitoring system at unit 6.
-
Benson Power Biomass Plant (PDF)(4 pp, 68 K,
June 7, 2018)
Approval of site-specific Fc factor methodology for unit BLR-1.
-
Lackawanna Energy Center LLC (PDF)(4 pp, 64 K,
August 21, 2018)
Approval to use an alternative fuel flowmeter calibration procedure for Units 1, 2 and 3.
-
CPV St. Charles Energy Center (PDF)(4 pp, 69 K,
August 21, 2018)
Approval to use an alternative fuel flowmeter calibration procedure for Units GT1 and GT2.
-
Winyah Generating Station (PDF)(5 pp, 83 K,
September 10, 2018)
Approval to use an alternative stratification test procedure for unit 1 through 4.
-
Albany Green Energy LLC (PDF)(5 pp, 68 K,
October 4, 2018)
Approval of a methodology to determine site-specific Fc values for unit B0004.
-
NextEra Energy Resources William F. Wyman Power Plant (PDF)(4 pp, 79 K,
October 9, 2018)
Approval to use an alternative fuel flowmeter calibration procedure for units 1-4.