Posted below are EPA's responses (in chronological order) to submitted Part 75 petitions in 2019. Note that the actual, signed and dated response sent to the designated representative constitutes EPA’s official response and governs. When a response is posted below, EPA is not aware of any differences between the posted response and the actual, signed and dated response. EPA intends, and believes, that such differences -- if any -- will be minor and non substantive. For more information, or to see petition responses from other years, return to Part 75 Petition Responses.
You may need a PDF reader to view some of the files on this page. See EPA’s About PDF page to learn more.-
Muskogee Generating Station (PDF)(3 pp, 139 K,
February 5, 2019)
Approval for a waiver of the requirement to provide operating data to qualify as “gas-fired” for Units 4 and 5.
-
Moxie Freedom Power Plant (PDF)(4 pp, 139 K,
February 14, 2019)
Approval to use an alternative fuel flowmeter calibration procedure for Units 201 and 202.
-
Greenidge Electric Generating Station (PDF)(7 pp, 132 K,
March 18, 2019)
Denial of a request to use alternative methodologies for determining emissions and heat input data reported for Unit 6.
-
Birdsboro Power Project (PDF)(4 pp, 154 K,
May 9, 2019)
Approval to use an alternative fuel flowmeter calibration procedure for Unit 01.
-
Orange Grove Energy Center (PDF)(3 pp, 121 K,
May 30, 2019)
Approval to use of hourly gross calorific value (GCV) analysis in calculation of hourly heat input from units CTG1 and CTG2.
-
New Madrid Power Plant (PDF)(5 pp, 153 K,
June 27, 2019)
Approval of an alternate data substitution methodology for Unit 2.
-
CPV Fairview Energy Center (PDF)(4 pp, 160 K,
July 8, 2019)
Approval to use an alternative fuel flowmeter calibration procedure for Units CT-1 and CT-2.
-
Spruance Genco LLC (PDF)(3 pp, 113 K,
July 11, 2019)
Approval for a waiver of the requirement to provide operating data to qualify as “gas-fired” for Units BLR3A, BLR3B, BLR4A and BLR4B.
-
Decker Creek Power Plant (PDF)(4 pp, 175 K,
November 6, 2019)
Approval for a waiver of certain disqualification and requalification provisions of the low mass emissions (LME) methodology for units GT-4A and GT-4B.
-
Alabama Power (PDF)(4 pp, 150 K,
November 13, 2019)
Approval to use an alternative stratification test procedure at multiple units at the Barry, Gadsden, Gaston, Greene County, Miller, Theodore, and Washington County power plants.
-
Naughton Power Plant (PDF)(3 pp, 115 K,
November 26, 2019)
Approval for a waiver of the requirement to provide operating data to qualify as “gas-fired” for Unit 3.
-
Bridgeport Harbor Station (PDF)(4 pp, 156 K,
December 9, 2019)
Approval to use an alternative fuel flowmeter calibration procedure for Unit 5.