Posted below are EPA's responses (in chronological order) to submitted Part 75 petitions in 2020. Note that the actual, signed and dated response sent to the designated representative constitutes EPA’s official response and governs. When a response is posted below, EPA is not aware of any differences between the posted response and the actual, signed and dated response. EPA intends, and believes, that such differences -- if any -- will be minor and non substantive. For more information, or to see petition responses from other years, return to Part 75 Petition Responses.
You may need a PDF reader to view some of the files on this page. See EPA’s About PDF page to learn more.-
CPV Towantic Energy Center (PDF)(4 pp, 177 K,
January 6, 2020)
Approval to use an alternative fuel flowmeter calibration procedure for units 1 and 2.
-
Salem Harbor Station NGCC (PDF)(4 pp, 156 K,
January 16, 2020)
Approval to use an alternative fuel flowmeter calibration procedure for units 1 and 2.
-
Riverside Energy Center (PDF)(4 pp, 216 K,
February 6, 2020)
Approval to use an alternative fuel flowmeter calibration procedure for units CT-03 and CT-04.
-
Canal Station (PDF)(6 pp, 214 K,
February 26, 2020)
Approval to use an alternative fuel flowmeter calibration procedure and to use hourly gross calorific value (GCV) data in calculations of hourly heat input rate for units 1, 2, and 3.
-
AES Warrior Run (PDF)(3 pp, 107 K,
March 5, 2020)
Approval to accept the results of the March 2019 relative accuracy test audits at unit 001.
-
Carroll County Energy Center (PDF)(4 pp, 241 K,
June 17, 2020)
Approval to use an alternative fuel flowmeter calibration procedure for units 1 and 2.
-
Greenwood Energy Center (PDF)(4 pp, 243 K,
June 17, 2020)
Approval to use the low mass emissions (LME) methodology in 40 CFR 75.19 for units 1, 2, 3, and 4.
-
Morris Cogeneration Power Plant (PDF)(5 pp, 249 K,
June 23, 2020)
Approval to use an alternative fuel flowmeter calibration procedure for units CTG1, CTG2 and CTG3.
-
Sewaren Generating Station (PDF)(4 pp, 219 K,
July 16, 2020)
Approval to use an alternative calibration procedure for unit 7.