Technical Reports related to the cleanup progress of the Northeast Church Rock Mine (NECR).
If you experience a problem reading a document with assistive technology, please contact us.
You may need a PDF reader to view some of the files on this page. See EPA’s About PDF page to learn more.
-
NECR Engineering Evaluation Cost Analysis (PDF)(84 pp, 20 MB,
May 2009)
This Engineering Evaluation/Cost Analysis (EE/CA) document evaluates Non-Time-Critical Removal Action alternatives for the cleanup of contaminated soil and sediment mine wastes at the Northeast Church Rock Mine Site.
-
NECR 95 Percent Design Drawings Volume 2 (PDF)(84 pp, 46 MB,
October 2017)
Design documents for the Northeast Church Rock Mine Site Waste Repository on the United Nuclear Corporation Mill Site.
-
NECR Consolidation and Groundwater Analysis Report (DRAFT) (PDF)(79 pp, 3 MB,
July 2018)
This report provides modeling results and analysis of whether there could be any potential impact to groundwater by placing the Northeast Church Rock (NECR) mine waste on the UNC Mill Site.