This is not the current EPA website. To navigate to the current EPA website, please go to www.epa.gov. This website is historical material reflecting the EPA website as it existed on January 19, 2021. This website is no longer updated and links to external websites and some internal pages may not work. More information »

New Bedford Harbor

Lower Harbor Confined Aquatic Disposal (CAD) Cell

You may need a PDF reader to view some of the files on this page. See EPA’s About PDF page to learn more.
On this page:

CAD Cell Workgroup Meetings


Technical Workgroup Documents

Lower Harbor 2016 Confirmatory Sediment Sampling

December 2016 Technical Workgroup Documents

July 7, 2015 Meeting Documents

EPA CAD cell docs

NBH Water Quality Monitoring

New Bedford Harbor Navigational CAD Cells

Volumes, Areas and Properties of Sediment by Management Units, NBH Site (2003)

New Bedford Harbor Air Quality Monitoring

Top of Page


CAD Cell Q&A

Printable version of CAD Cell Fact Sheet (PDF) (2 pp, 1 MB)

Simplified schematic of how the CAD cell will be constructed
Simplified schematic of how the CAD cell will be constructed

What is a CAD Cell?
The New Bedford Harbor Superfund CAD cell will be a man-made, capped underwater containment cell. First the area for the CAD cell is dug into the harbor floor, excavating the sediment to create the space for the CAD. The original material is excavated and taken to an approved off-shore facility or reused for beneficial uses if appropriate. Contaminated sediment from the harbor will then be placed into the CAD cell, allowed time to consolidate and then capped. The contaminated sediment is held in place by existing clean sediments on the sides and bottom of the cell, and a cap on the top. CAD cells have been used successfully for contaminated navigational sediments in New Bedford as well as many other ports and waterways including Boston and Providence. A simplified schematic of how the CAD cell will be constructed is shown to the right.

When did EPA decide to use a CAD cell?
The decision to build the CAD cell was made in March 2011 by the US EPA after public comment. The CAD cell is being designed now – early in 2012. Construction is expected to begin later in the year. The CAD cell will be located in a state-approved area in New Bedford Harbor between the I-195 and Rt. 6 bridges.

Why has EPA chosen to use a CAD cell in New Bedford Harbor?
The CAD cell will enable completion of the lower harbor cleanup more quickly, and at a lower cost. The CAD cell was selected for the disposal of 300,000 cubic yards of sediment containing between 50-190 ppm of PCBs located mostly in the lower harbor south of the I-195 bridge. These levels are much lower than the levels found in the upper harbor, which range up to four thousand ppm of PCBs.

How long will the CAD cell project take to complete?
The CAD cell is anticipated to be dug beginning this year and completed in 2013. The time and cost to complete the harbor cleanup, including the filling of the CAD cell with contaminated material and the capping of the CAD cell, depends entirely on annual funding appropriations. Keeping in mind the decades-long timeframe that remains for cleanup of the harbor, there can be no guarantee what future funding levels will be.

How much of New Bedford Harbor will be cleaned up as a result of using the CAD cell?
After the CAD cell is filled, more than 80% of the geographic area of (the Upper and Lower Harbor Operable Unit) the New Bedford Harbor Superfund Site requiring cleanup under the Superfund program will be safely disposed of into the CAD cell. Specifically, almost all of the sediment exceeding Superfund cleanup levels located between Sawyer Street to the north and the hurricane barrier to the south (approximately 300,000 cubic yards) will be disposed of into the CAD cell.

How do you know it will be safe to install the CAD cell and keep it sealed?
Data collected and evaluated during the construction of other CAD cells, including in New Bedford, supports EPA's determination that a CAD cell is a safe, permanent solution for disposing of contaminated Harbor sediment. EPA has also conducted computer modeling of potential leakage of contaminants which shows that a CAD cell located in New Bedford Harbor would be stable and not subject to leakage to the environment. EPA will conduct an extensive program of monitoring air, water, and sediment during the project and make the data available to the public. As with any cleanup site, if significant issues arise during design and construction of a remedy, we would re-evaluate the issue(s) to make sure that our remedy protects human health and the environment. EPA does not intend to move forward with any remedy that does not protect the health of New Bedford citizens, or the harbor.

Who is performing the design and construction?
The work is being performed through a cooperative agreement that EPA has signed with the New Bedford Harbor Development Commission (HDC) which has extensive experience with the construction and filling of CAD cells. The HDC has hired APEX Companies, LLC to design and construct the CAD cell. APEX has prior experience designing and overseeing construction of navigational CAD cells in New Bedford Harbor.

How can I get more information about the CAD cell project?
In addition to ongoing community outreach, EPA has funded a "Technical Assistance Grant" or "TAG" to the Buzzard's Bay Coalition. Dr. Frank Bohlen of the Department of Marine Sciences at the University of Connecticut has been hired with TAG funds to review technical information about the project. As part of the EPA decision to design, construct, and fill a CAD cell, a technical workgroup (TWG) open to individuals and organizations interested in the project was formed to review and discuss design and construction documents. Dr. Bohlen will be attending the TWG meetings to provide technical input to the group, address community questions about technical aspects of the project, and provide feedback to EPA.

What are some elements of a TAG?

The TAG program provides money to community groups to pay for technical advisors to interpret and explain technical reports, site conditions, and EPA's current and future cleanup plans

Once EPA has provided the $50,000 grant, it can be used for up to three years with extensions possible if needed and Additional TAG funds may be available. Only one TAG can be given for each Superfund site.

Top of Page


Pre-design Historic Data and Investigations

Lower Harbor Combined Aquatic Disposal (CAD) Cell (LHCC) Data Package Summary Memo (Data Package Attached) (PDF) (2,219 pp, 139.1 MB)

Apex Companies, LLC Cover Memo to Harbor Development Commission

Harbor Bottom Bathymetry Data
This information outlines the existing bathymetry, measured in feet below Mean Lower Low Water, of the existing bottom of the harbor within the area anticipated to be utilized to construct the LHCC. It includes the following figure, which is a visual representation of the bathymetry:

Harbor Sediment Boring Data
This information includes both historic and more recent borings, as well as geotechnical analytical data generated from those borings, that have been advanced within the area where the LHCC is being considered to be sited. Geotechnical analytical data is also included that is representative of material to be placed into the LHCC. The data includes the following:

CAD Cell Pre-design Historical Data
This is historic information that is relevant to the siting and design of the LHCC. It is organized into a number of sub-categories as follows:

Historic Air Evaluations
This information has been provided (along with the New Bedford Superfund Site Risk Assessments) to address concerns by the public regarding the risks associated with concentrations of PCBs in air. It includes the following reports:

Historic New Bedford Harbor Superfund Risk Assessments
This information has been provided to provide a background for the human health and ecological risks associated with PCBs in New Bedford Harbor that drove the 1998 Record of Decision and subsequent Explanations of Significant Differences, including the Lower Harbor CAD Cell.

Historic USEPA LHCC Feasibility Assessments
This information has been provided to outline the assessments USEPA conducted prior to implementing the Explanation of Significant Differences associated with the LHCC.

Historic Background Material and Literature
This information has been provided to outline background information regarding CAD Cells, as well as some background information regarding the mass of PCBs associated with the New Bedford Harbor Superfund Site.

Historic Remote Sensing Reports
This information includes remote sensing reports that have been prepared within the area where the LHCC is being considered to be sited:

Historic Navigational Dredging Water Quality Measurements
This information includes water quality measurements that have been completed associated with the Phase II and Phase III Navigational Dredging program, which included mechanical dredging, and placement of material into CAD Cells.

Historic Suspended Sediment Transport Modeling and Measurement
This information includes transport modeling associated with CAD Cell planning associated with the Dredge Material Management Plan process as well as a flux analysis conducted by EPA indicating the quantity of contaminated sediment entering Buzzard's Bay under existing conditions.

Historic Toxicity Testing
This information includes toxicity testing associated with suspended sediment anticipated to be generated during placement of contaminated material into CAD Cells.

Seismic Data
This information includes geophysics reports (seismic and sub-bottom analyses) that have been prepared for the area anticipated to be utilized to construct the LHCC. This information is primarily historic.

Vibracore Data
This information includes vibracores that have been advanced within the area where the LHCC is being considered to be sited. This information is primarily historic. Information to supplement this data is currently being generated, but is not currently available:

Conceptual LHCC Siting Plans
These figures have been generated to outline a number of conceptual locations for the proposed LHCC. Once a location has been finalized, final design of the LHCC will begin.

Top of Page