An official website of the United States government.

This is not the current EPA website. To navigate to the current EPA website, please go to www.epa.gov. This website is historical material reflecting the EPA website as it existed on January 19, 2021. This website is no longer updated and links to external websites and some internal pages may not work. More information »

Red Hill

October 2016 TIRM Report List of Appendices

Appendices to the October 2016 Red Hill Administrative Order on Consent (AOC) Statement of Work (SOW) Tank Inspection, Repair & Maintenance (TIRM) Report.

PLEASE READ
Many of the PDF's below are extremely large files. For best results, right-click the PDF link and select "Save link as..." then save to your desktop. You will need Adobe Reader to view files on this page. See EPA’s About PDF page to learn more. If you experience a problem reading a document with assistive technology, please contact us.

List of Appendices: Red Hill AOC SOW TIRM Report

  • A: Telltale Piping Holes
  • B: Red Hill Dome Truss Scaffold
  • C: Red Hill Monorail Scaffold
  • D: Boom and Basket System
  • E: API 653 Inspection Report Tank 13 July 1995
  • F: API 653 Inspection Report Tank 10 1998
  • G: API 653 Report Tank 7 1998
  • H: API 653 Report Tank 8 1998
  • I: Contract Number FA8903-04-D-8681-0176-All

Appendix J: Tank 16 API 653 Final Inspection Report

Appendix K: Tank 6 API 653 Inspection Report

Appendix L: Tank 15 API 653 Inspection Report

  • M: Contract Number N47408-04-D-8503-0031-All
  • N: API 653 Inspection Tank 2 2008
  • O: API 653 Inspection Tank 20 2008
  • P: Contract Number N62583-09-D-0132-0003-All
  • Q: WGS Daily Production Report Tanks 5 and 17

Appendix R: Tanks 5 and 17 Cleaning, Inspection and Repairs Project Execution Work Plan

Appendix S: Tanks 5 and 17 Pressure Washing; Request for Information/Clarification (RFI)

Appendix T: Final Draft Tank 5 Inspection and Integrity Report

  • U: CSI Services – Daily Coating Inspection Report
  • V: WGS Work Plan – Abrasive Blasting and Surface Preparation 2012
  • W: WGS Warranty Work Plan
  • X: NAVFAC Drawing No. 7019545 MILCON P-060 coating details

Appendix Y: Not Used

Appendix Z: Not Used

  • AA: WGS Analysis Hydro Report
  • AB: WGS Redhill Complex TK 5 Project – Pressure Test Log
  • AC: Willbros D0132 DO 3 Red Hill mod 9
  • AD: WGS ASNT Records
  • AE: Tank 5 Inspection Checklist
  • AF: FY-78 MILCON P-060 Scope of Work
  • AG: WGS Weld WPS and PQR
  • AH: WGS WPQ Records
  • AI: WGS Daily Report 01-16-13 Rev 0
  • AJ: Tank 5 Warranty notice
  • AK: Notice to Proceed Oct 2014
  • AL: TK 5 Visual Inspection Report Signed
  • AM: TK 5 MT-LT Inspection Report
  • AN: WGS Tank 5 Work Plan Appendix M
  • AO: WGS Free Product Report
  • AP: WGS Tank 5 Pressure Testing Procedure Jun 2014
  • AQ: WGS Tank 5 Pressure Testing Report Jun 2014
  • AR: QASP RHT5 Warranty Rework
  • AS: WGS Tank 5 Suitability For Service Statement

Appendix AT: Tank 5 & 17 Cleaning, Inspection and Repairs Project Executions Work Plan

  • AU: WGS D-0132 Basic Award
  • AV: WGS Sample and Drain Line Drawings
  • AW: WGS Tank 5 Repairs – Repair NDE QC Data
  • AX: List of Welder PQR
  • AY: API Inspector Qualifications
  • AZ: NAVSUP GLS Instruction 10345.1 – Fuel Tank Return to Service
  • BA: Contract Number N62742-03-C-1402-All
  • BB: Red Hill Tank 5 Inspection SOW
  • BC: Generic 653 SOW April2010
  • BD: UFGS Section 33 56 17.00 20
  • BE: UFGS Section 33 56 18.00 20
  • BF: Telltale Leak Detection System
  • BG: DLA ATG Policy Letter 2009
  • BH: NAVSEA 5104 14 August 2011 RSO Application
  • BI: NAVFACINST 5104 1
  • BJ: Report on the Trip to Pacific Division Naval Facilities Command
  • BK: Acquisition Schedule Red Hill CIR
  • BL: Overall CIR Schedule without modification
  • BM: Red Hill Tank CIR Contract Sequencing
  • BN: Contract Number N39430-15-D-1632-0005 Tanks 14, 17, 18
  • BO: Contract Number N39430-15-D-1632-0004 Tanks 4, 13
  • BP: NAVFAC Drawing No. 7019544 MILCON P-060

Documents

PLEASE READ
Many of the PDF's below are extremely large files. For best results, right-click the PDF link and select "Save link as..." then save to your desktop. You will need Adobe Reader to view files on this page. See EPA’s About PDF page to learn more. If you experience a problem reading a document with assistive technology, please contact us.

You may need a PDF reader to view some of the files on this page. See EPA’s About PDF page to learn more.
  • Red Hill AOC SOW TIRM Report: List of Appendices (PDF)(2 pp, 37 K, October 11, 2016)
    List of appendices to the Red Hill AOC SOW Tank Inspection, Repair & Maintenance (TIRM) Report.
  • Red Hill AOC SOW TIRM Report: Appendices A-I (PDF)(343 pp, 16 MB, January 2007)
    Appendices A-I to the 2016 Red Hill AOC SOW Tank Inspection, Repair & Maintenance (TIRM) Report - Appendix A: Telltale Piping Holes. Appendix B: Red Hill Dome Truss Scaffold. Appendix C: Red Hill Monorail Scaffold. Appendix D: Boom and Basket System. Appendix E: API 653 Inspection Report Tank. Appendix F: API 653 Inspection Report Tank. Appendix G: API 653 Report Tank 7. Appendix H: API 653 Report Tank. Appendix I: Contract Number FA8903-04-D-8681-0176-All
  • Red Hill AOC SOW TIRM Report: Appendix J (PDF)(659 pp, 85 MB, January 2007)
    Appendix J to the 2016 Red Hill AOC SOW Tank Inspection, Repair & Maintenance (TIRM) Report: Tank 16 Final API 653 Inspection Report.
  • Red Hill AOC SOW TIRM Report: Appendix K (PDF)(719 pp, 84 MB, January 2007)
    Appendix K to the Red Hill AOC SOW Tank Inspection, Repair & Maintenance (TIRM) Report: FINAL Tank 6 API 653 Inspection Report.
  • Red Hill AOC SOW TIRM Report: Appendix L (PDF)(496 pp, 74 MB, January 2007)
    Appendix L to the 2016 Red Hill AOC SOW Tank Inspection, Repair & Maintenance (TIRM) Report: Tank 15 API 653 Inspection Report.
  • Red Hill AOC SOW TIRM Report: Appendices M-Q (PDF)(691 pp, 43 MB, October 2016)
    Appendices M-Q to the 2016 Red Hill AOC SOW Tank Inspection, Repair & Maintenance (TIRM) Report: Tank 16 Final API 653 Inspection Report. Appendix M: Contract Number N47408-04-D-8503-0031-All. Appendix N: API 653 Inspection Tank 2 2008. Appendix O: API 653 Inspection Tank 20 2008. Appendix P: Contract Number N62583-09-D-0132-0003-All. Appendix Q: WGS Daily Production Report Tanks 5 and 17.
  • Red Hill AOC SOW TIRM Report: Appendix R (PDF)(248 pp, 38 MB, May 2010)
    Appendix R to the 2016 Red Hill AOC SOW Tank Inspection, Repair & Maintenance (TIRM) Report: Tanks 5 and 17 Cleaning, Inspection and Repairs Project Execution Work Plan.
  • Red Hill AOC SOW TIRM Report: Appendix S (PDF)(1 pg, 171 K, October 2010)
    Appendix S to the 2016 Red Hill AOC SOW Tank Inspection, Repair & Maintenance (TIRM) Report: Willbros Government Services, LLC (WGS) Request for Information/Clarification (RFI) re: RFI6 Pressure Washing.
  • Red Hill AOC SOW TIRM Report: Appendix T (PDF)(591 pp, 92 MB, November 2010)
    Appendix T to the 2016 Red Hill AOC SOW Tank Inspection, Repair & Maintenance (TIRM) Report: Willbros Government Services, LLC (WGS) Tank 5 Inspection Report.
  • Red Hill AOC SOW TIRM Report: Appendices U-X (PDF)(306 pp, 46 MB, October 2016)
    Appendices U-X to the 2016 Red Hill AOC SOW Tank Inspection, Repair & Maintenance (TIRM) Report: Appendix U: CSI Services – Daily Coating Inspection Report. Appendix V: WGS Work Plan – Abrasive Blasting and Surface Preparation 2012. Appendix W: WGS Warranty Work Plan. Appendix X: NAVFAC Drawing No. 7019545 MILCON P-060 coating details.
  • Red Hill AOC SOW TIRM Report: Appendices AA-AG (PDF)(92 pp, 15 MB, August 2014)
    Appendices AA-AG to the 2016 Red Hill AOC SOW Tank Inspection, Repair & Maintenance (TIRM) Report: Appendix AA: WGS Analysis Hydro Report. Appendix AB: WGS Redhill Complex TK 5 Project – Pressure Test Log. Appendix AC: Willbros D0132 DO 3 Red Hill mod 9. Appendix AD: WGS ASNT Records. Appendix AE: Tank 5 Inspection Checklist. Appendix AF: FY-78 MILCON P-060 Scope of Work. Appendix AG: WGS Weld WPS and PQR.
  • Red Hill AOC SOW TIRM Report: Appendices AH-AS (PDF)(203 pp, 42 MB, October 2016)
    Appendices AH-AS to the 2016 Red Hill AOC SOW Tank Inspection, Repair & Maintenance (TIRM) Report: Appendix AH: WGS WPQ Records. Appendix AI: WGS Daily Report 01-16-13 Rev 0. Appendix AJ: Tank 5 Warranty notice. Appendix AK: Notice to Proceed Oct 2014. Appendix AL: TK 5 Visual Inspection Report Signed. Appendix AM: TK 5 MT-LT Inspection Report. Appendix AN: WGS Tank 5 Work Plan Appendix M. Appendix AO: WGS Free Product Report. Appendix AP: WGS Tank 5 Pressure Testing Procedure Jun 2014. Appendix
  • Red Hill AOC SOW TIRM Report: Appendix AT (PDF)(247 pp, 38 MB, April 2010)
    Appendix AT to the 2016 Red Hill AOC SOW Tank Inspection, Repair & Maintenance (TIRM) Report: WGS Repair Work Plan Red Hill Tank 5 & 17 Cleaning, Inspection and Repairs Project Execution Work Plan.
  • Red Hill AOC SOW TIRM Report: Appendices AU-BP (PDF)(441 pp, 37 MB, October 2016)
    Appendices AU-BP to the 2016 Red Hill AOC SOW Tank Inspection, Repair & Maintenance (TIRM) Report: Appendix AU: WGS D-0132 Basic Award. Appendix AV: WGS Sample and Drain Line Drawings. Appendix AW: WGS Tank 5 Repairs – Repair NDE QC Data. Appendix AX: List of Welder PQR. Appendix AY: API Inspector Qualifications. Appendix AZ: NAVSUP GLS Instruction 10345.1 – Fuel Tank Return to Service. Appendix BA: Contract Number N62742-03-C-1402-All. Appendix BB: Red Hill Tank 5 Inspection SOW. Appendix BC: G